Home » Products » Solution » Die Transfer Cart » Battery Powered 20tons Self-Propelled Modular Transporter For Between Storage Area And Injection Machine Tranport

Battery Powered 20tons Self-Propelled Modular Transporter For Between Storage Area And Injection Machine Tranport

Usage:Heavy Duty Material Transportation 
Application:Steel Industry, Factory, Warehouse, Port 
Brand:Perfect 
Load Capacity:1-300 Ton
Special Function:Anti-Explosion, Heat-Resistant, Lifting 
Control Mode:Pendant/Remote/PLC Control 
Power Mode:Battery/cable powered/rail powered…. 
Color:Customzied 
Trademark:PERFECT 
Transport Package:The Whole Cart Will Be Packed by Tarp. 
Specification:Customized 

Rated 4.7/5 based on 436 customer reviews
Content

Battery Powered 20tons Self-Propelled Modular Transporter For Between Storage Area And Injection Machine Tranport

In recent years, it has been widely used in the offshore engineering market, such as the transportation, loading and unloading of oil platforms, jackets or LNG modules. These goods are usually more than 1,000 tons, and they are often at the level of 10,000 tons. Before Self-Propelled Modular Transporter was widely used, these oversized goods could only be moved by laying slides on the ground and dragging by steel ropes. The investment in infrastructure was large, the efficiency was low, and the site utilization rate was even lower, while Self-Propelled Modular Transporter can move these behemoths freely and easily, greatly improving efficiency and economy.

The biggest feature of Self-Propelled Modular Transporter is its convenience and adaptability. In large-scale engineering projects, there are many things that we wanted and couldn’t do in the past, and now SPMT can realize them. For example, in the process of urbanization demolition, it is inevitable to encounter some valuable old buildings. We neither want to destroy them nor keep them in place, so we can use SPMT to transport them to any place. Or, the aging interchange bridge needs to be repaired or replaced, which is almost impossible to achieve without affecting the traffic, so it only takes a few hours to use the Self-Propelled Modular Transporter to replace the entire new bridge section.

Inquiry
* Name:
* Email:
Country:
Tel/Whatsapp:
* Message:
More